OFFICE STRIPOUT

How Much Does a Commercial Stripout Cost in Australia?

Author picture

Published by

Updated on

Subscribe to our newsletter

Subscribe to get performance-led thinking, industry trends, and real-world lessons delivered straight to your inbox.

We care about your privacy

Table of contents

Stripout cost is one of the first questions tenants ask when an end-of-lease conversation starts. You have a budget to plan, a timeline to manage, and obligations to meet. You want to know what you are up for.

The honest answer is: it depends. Not in a vague way, but in a way that is worth understanding, because the factors that drive stripout costs are within your control to manage. Knowing what drives the number means you can scope properly, compare quotes fairly, and avoid last-minute surprises.

If you want to understand what a stripout actually involves before reading about cost, start here:

What Is an Office Stripout? 

nmgs.com.au/blog/office-stripout-process-explained

What Are You Actually Paying For?

A commercial stripout and make good project covers the physical demolition and removal of all tenant-installed fitout, plus all reinstatement works required to meet your lease obligations.

A typical commercial make good quote includes:

  • Partition and ceiling removal
  • Floor covering removal (carpet, vinyl, raised access flooring)
  • Joinery and built-in furniture removal
  • Services disconnection: electrical, data, plumbing, and HVAC
  • Surface patching and plastering
  • Repainting walls and ceilings
  • Final professional clean
  • Waste removal and disposal

 

Some projects also require permits and approvals, asbestos assessment and removal, and specialist reinstatement works. These are project-specific and quoted separately.

What Does a Commercial Stripout Cost? Typical Ranges

Commercial office refurbishments and make good projects at NMGS generally start from around $15,000 for minor upgrades and can exceed $250,000 for larger fitouts, staged refurbishments, and complex live-site projects. The best way to obtain accurate pricing is through a tailored site inspection and scope review.

The table below gives a breakdown by project type based on NMGS project experience.

 

Project Type

Typical Range

Typical Scope

Office stripout / defit

$8,000 to $20,000

Fitout removal, services disconnection, waste disposal

Small office refresh

$15,000 to $30,000

Targeted defit, minor repairs, repaint, end-of-lease clean

Mid-size office refurbishment

$40,000 to $150,000

Full stripout, repairs, reinstatement, repaint, clean, services scope

Full office fitout / refurbishment

$150,000+

Complete defit, full reinstatement, compliance works, specialist trades

Warehouse office refurbishment

$25,000+

Office defit, repairs, repaint, services; warehouse scope quoted separately

Industrial refurbishment

Project-specific

Racking removal, floor sealing, line marking, industrial services; site inspection required

 

Important

These are indicative ranges based on NMGS project experience across Melbourne, Sydney, Brisbane, and nationally. Your actual cost depends on lease scope, building condition, fitout complexity, and access constraints. A site inspection is required for accurate pricing.

What Drives the Cost Up or Down?

Your make good clause

Your lease is the single biggest variable. Some clauses require full restoration to base building. Others are limited to broom-clean handover with minor repairs. The difference in cost between those two scenarios on the same space can be significant.

How much was installed during the tenancy

The more extensive your original fitout, the more expensive the stripout. A tenancy with custom partitioning, raised access flooring, a server room, a kitchenette, and supplementary HVAC costs significantly more to defit than a basic open-plan office.

Services complexity

Services disconnection and reinstatement are consistently underestimated in early budget planning. Licensed electricians, plumbers, and HVAC technicians add real cost, and the scope varies significantly based on what was installed.

Asbestos and hazardous materials

Commercial buildings constructed before the mid-1980s may contain asbestos-containing materials. A licensed asbestos assessment is required before any demolition begins. If ACMs are present, licensed removal is mandatory under Australian WHS legislation. This adds cost and programme time and is not discretionary.

Building access and operational constraints

A CBD tenancy with loading dock restrictions, no-noise requirements after business hours, and mandatory inductions for all trades carries a higher delivery cost than an accessible suburban site. After-hours work and live-site staging both affect the overall budget.

Scope negotiation with the landlord

If your fitout is relatively recent or the landlord has an incoming tenant who wants to retain parts of it, there may be room to negotiate a reduced make good scope. Getting into this conversation early gives you the most flexibility.

Why Do Stripout Quotes Vary So Much?

Different scope assumptions

Without a site inspection and a confirmed scope, contractors make different assumptions about what is included. One might allow for asbestos management. Another might not. The quote difference is often about scope, not margin.

Licensing and compliance

Commercial make good requires licensed builders, electricians, and plumbers. Quotes that are noticeably lower often reflect unlicensed labour. Using unlicensed tradespeople on a commercial site creates risk for the tenant: defective works can be rejected at final inspection at your cost.

What is and is not included

Some quotes exclude waste disposal, permit fees, or asbestos management. Ask for a line-item breakdown and confirm all exclusions before accepting any quote. An all-inclusive quote from a licensed contractor is often better value than a lower number that grows through variations.

How to Get Accurate Pricing

The most effective way to get a reliable quote is to give your contractor the information they need to price without guessing.

  • Have your make good clause reviewed before quoting – your contractor should be working from actual lease requirements
  • Book a site inspection – any reputable contractor should inspect before pricing
  • Provide your lease commencement condition report if you have one

 

NMGS approach

We conduct a site inspection before every quote and provide a written scope and price based on confirmed requirements. No estimates from floor area alone. If something emerges during works that was not visible at inspection, we tell you before it becomes a cost variation.

Frequently Asked Questions

How much does a small office stripout cost?

An office stripout covering fitout removal, services disconnection, and waste disposal typically starts from $8,000 to $20,000 depending on fitout complexity and building access. A small office refresh including repairs, repaint, and clean is generally $15,000 to $30,000. A site inspection is needed to confirm.

Is there a standard per-square-metre rate for make good?

Per-square-metre rates are sometimes used as a rough guide but they are not reliable for accurate pricing. Two offices of the same floor area can have very different make good costs depending on what was installed, what the lease requires, and what the site conditions are like.

Who pays for make good works?

In standard Australian commercial leases, the outgoing tenant is responsible for all make good costs unless the lease specifically states otherwise.

What is the cheapest way to manage make good?

Review your lease clause carefully, negotiate scope with your landlord where appropriate, and engage a licensed contractor who can do the work properly the first time. Shortcuts on licensing tend to create problems at final inspection that cost more to fix than they saved upfront.

Get Your Obligation-Free Quote

NMGS is a Registered Commercial Builder with over 50 years of experience delivering commercial stripout and make good services across Melbourne, Sydney, Brisbane, and nationally throughout Australia. We offer obligation-free site inspections and written quotes based on confirmed scope.

 

Contact NMGS: nmgs.com.au/make-good/

Phone: 1300 364 994

 

Other Guides in This Series

→  How Much Does a Commercial Stripout Cost in Australia? 

nmgs.com.au/blog/commercial-stripout-cost-australia

→  How Much Does a Professional Lease Make Good Service Cost? 

nmgs.com.au/blog/lease-make-good-service-cost

→  How to Estimate Make Good Costs for an Office Tenancy  

nmgs.com.au/blog/how-to-estimate-make-good-costs-office-tenancy

→  How to Plan an Office Stripout Before Refurbishment 

nmgs.com.au/blog/how-to-plan-office-stripout-before-refurbishment

→  Office Defit Checklist for Tenants 

nmgs.com.au/blog/office-defit-checklist-tenants