Most tenants asking how much a commercial make good costs want a number first. As a general guide, budget $70 to $300 or more per square metre, depending on how much fit-out has to come out and the condition your lease requires at handover. 

A light clean, patch and paint sits at the lower end of that range. Removing kitchens, showers or complex services pushes it towards the top. 

The tables below break the cost down by scope and tenancy size, so you can put a realistic first budget together before you request a quote. 

WHAT DRIVES COMMERCIAL MAKE GOOD COSTS?

Every make good price is built from the same set of variables. The more of these your tenancy involves, the higher the cost per square metre. 

  • Size of tenancy and density of fit-out 
  • Extent of demolition and disposal 
  • Repainting requirements to achieve a uniform finish 
  • Ceiling tile and lighting repairs 
  • Floor repairs or replacement 
  • Service work to make safe and terminate electrical and data 
  • Testing and certification for mechanical and fire 
  • Access limits, such as short dock windows and after-hours only work 

Special items like kitchens, showers and heavy equipment add trade time and compliance checks. Heritage or premium buildings may have higher finish standards and tighter rules. 

Commercial office boardroom make good with a timber meeting table, black-framed glass partitions and charcoal carpet tiles

HOW TO BUILD A RELIABLE MAKE GOOD BUDGET

  1. Extract the exact lease clause and schedules 
  2. Walk the site and produce a measured scope 
  3. Seek written acceptance from the owner or manager before pricing 
  4. Request an itemised price that separates base scope from allowances 
  5. Include a reasonable contingency for hidden conditions behind walls and ceilings 
  6. Tie progress claims to milestones for predictable cash flow 

MAKE GOOD COST GUIDE: INDICATIVE RANGES PER SQUARE METRE

Commercial make good costs fall into three broad bands. The rate per square metre rises with the amount of demolition, services work and repair needed to return the space to its lease condition. 

Scope levelWhat’s typically involvedIndicative cost per m² (ex GST)Time guide
Light reinstatementClean, patch and paint with minor make safe$100 to $1502 to 4 weeks
Standard reinstatementRemove partitions, repaint throughout, ceiling and floor repairs, service sign off$150 to $2004 to 8 weeks
Heavy reinstatementRemove kitchens or showers, complex services, significant repairs$200+ (dependent on make good requirements)8 to 12 weeks

Time guides include planning. These are general examples. Always confirm with National Make Good Solutions and building management and obtain a quote.

Prefer to see total budgets by job type? Our guide to lease make good service costs covers stripouts, office refreshes and full refurbishments.

Estimated Make Good Cost by Tenancy Size

To turn a rate into a total, multiply it by your floor area. The figures below do exactly that, using the ranges above. Treat them as an early budgeting tool, since minimum charges, access rules and site conditions can push a small or unusually large job outside a straight-line estimate.

Tenancy sizeLight reinstatementStandard reinstatementHeavy reinstatement
100 m²$10,000–$15,000$15,000–$20,000$25,000–$30,000+
250 m²$25,000–$37,500$37,500–$50,000$62,500–$75,000+
500 m²$50,000–$75,000$75,000–$100,000$125,000–$150,000+
1,000 m²$100,000–$150,000$150,000–$200,000$250,000–$300,000+

For example, a 300 m² office make good involving partition removal and a full repaint would typically fall within the standard reinstatement category, with an indicative cost of $45,000 to $60,000.

These figures are indicative estimates only, based on typical commercial make good requirements. Actual costs will depend on tenancy condition, lease obligations, building services, access requirements and the scope of reinstatement. A site inspection and detailed quotation are recommended for accurate pricing.

Office make good with timber batten screens, built-in timber joinery, lounge seating and striped, grey carpet tiles

Cash Settlement Versus Doing the Make Good Works

A cash settlement can save time when deadlines are tight or when the landlord prefers to control the works. The amount should match realistic delivery cost for the agreed standard. Doing the works yourself keeps control of quality, sustainability choices and documentation. For some clients a blended approach makes sense, such as settling for certain items and completing others.

Cost Control Checklist

  • Confirm scope in writing
  • Book access early to avoid idle labour
  • Order long lead items, such as matching ceiling tiles
  • Reuse and donation reduce waste fees
  • Ask for a waste plan and completion report
  • Keep a live punch list and leave buffer time for defects

Frequently Asked Questions

As a general guide, allow $100 to $150 per m² for a light clean, patch and paint, $150 to $200 per m² for a standard reinstatement and $200 to $300 or more per m² for heavy works, such as removing kitchens, showers or complex services. 

Allow 2 to 4 weeks for a light reinstatement, 4 to 8 weeks for a standard job and 8 to 12 weeks for heavy works. These time guides include planning, so book building access and order long lead items early. 

Yes, when the scope is stable and the risks are low. A measured scope that the landlord or building manager has accepted in writing is the best basis for a fixed price. 

It depends on building age and complexity. Older buildings and heavier fit-outs tend to hide more behind walls and ceilings, so review the contingency once demolition starts. 

Usually, yes, because of supervision and access rules. Plan the program to keep after–hours work to a minimum where possible. 

Only with written approval. A uniform finish is often required, so have any reduced repaint scope signed off before work starts.

Get a Make Good Cost Estimate for Your Tenancy

Contact the team at National Make Good Solutions to request a budget and scope review. We will align the scope to your clause, provide transparent pricing and recommend cost control steps.

This guide provides general information only. Confirm legal and safety requirements with your landlord, building manager and qualified professionals.