Pallet Racking Melbourne | Amer Sports Warehouse Fit-Out

AMER SPORTS PHASE 1

Scroll to explore

CLIENT

Amer Sports (via ThreeSixty Supply Chain Group)

LOCATION

Cranbourne West, Victoria

Solution delivered

Selective pallet racking warehouse fit-out (Phase 1)

Carton live storage (CLS)

690 locations

INDUSTRY

Sporting goods distribution

Warehouse size

15,000

SQM

Pallet locations delivered

15,540

Number of aisles

17

PROJECT OVERVIEW

Supporting National Distribution Growth with a Scalable Warehouse Storage Solution

  

As demand continues to grow across the sporting goods and retail distribution sector, warehouse operators require storage systems that can scale efficiently while maintaining operational performance.

Dexion Victoria recently delivered Phase 1 of a major warehouse fit-out for Amer Sports in Cranbourne West, Victoria, supporting the establishment of a new national distribution centre. The project focused on the installation of a high-capacity pallet racking system, forming the foundation of the facility ahead of future mezzanine and automation works.

The result was a large-scale selective pallet racking installation designed to support immediate operational requirements while enabling future expansion.

DSC04303
DSC04348
DSC04567

THE CLIENT CHALLENGE

Amer Sports required a new warehouse facility to support continued growth across Australia and improve overall supply chain efficiency.

The project involved transitioning into a new 15,000sqm greenfield site, with the need to establish a high-performing storage system within a defined delivery program.

The brief extended beyond simply installing racking. The solution needed to:

  • Maximise storage capacity within the available footprint
  • Support efficient picking and replenishment workflows
  • Provide a practical and scalable layout
  • Align with future stages, including mezzanine and conveyor integration

A key consideration for this project was the staged delivery approach. Phase 1 focused on the pallet racking system, while later stages will introduce additional infrastructure. This required careful planning to ensure the initial installation would integrate seamlessly with future works.

The project also required coordination with multiple stakeholders, including ThreeSixty Supply Chain Group and the project builder, alongside evolving design requirements during delivery.

The objective

Dexion Victoria was engaged to deliver a warehouse storage solution that would:

  

DexTick

Establish the core storage infrastructure for the new facility

DexTick

Maximise pallet capacity while maintaining accessibility

DexTick

Support efficient warehouse operations from day one

DexTick

Provide a scalable foundation for future project stages

DexTick

Be delivered within program constraints

PROJECT OVERVIEW

The Warehouse Storage Solution Delivered by Dexion Victoria

  

Dexion Victoria delivered a selective pallet racking system designed to balance storage density with operational flexibility.

Selective pallet racking was selected as the most appropriate system for this facility, allowing direct access to all pallets while supporting a high-volume storage environment.

Learn more about pallet racking systems and how they support scalable warehouse operations.

The completed system included:

DSC04419-2

Selective pallet racking

Carton live storage (CLS) zones

Rack protection systems

Dedicated pick face areas

Mesh decking

Safety components integrated into the design

The layout was developed to support current operational requirements while also allowing for future mezzanine and automation integration, ensuring the solution remains relevant as the business continues to grow.

Warehouse Installation and Delivery

Dexion Victoria delivered the installation within a defined program, working in coordination with multiple stakeholders across the project.

Installation included:

Structured project planning and sequencing

Management of on-site safety and access

Coordination with consultants and builder

Dedicated installation teams to maintain progress

The project required flexibility, with adjustments made during delivery to align with ongoing design changes and site conditions. Maintaining communication across all parties was key to ensuring progress remained on track.

Safety and Compliance

Safety and Compliance

Safety was an important consideration throughout the project.

The system was designed and installed in accordance with AS 4084 racking standards, ensuring compliance with Australian requirements.

The installation incorporated:

  • rack protection systems
  • mesh decks
  • clearly defined storage and picking zones

 

These features contribute to safer warehouse operations and help reduce the risk of damage to infrastructure and equipment.

RESULTS

Results of the Cranbourne West Warehouse Fit-Out (Phase 1)

  

The completed Phase 1 installation delivered a strong operational foundation for Amer Sports’ new distribution centre.

DexSqTick

15,540 pallet locations delivered

The system provides significant storage capacity to support current operational requirements and future growth.

DexSqTick

High-volume picking capability

With 9,636 pick locations and integrated carton live storage, the facility is equipped to handle fast-moving product efficiently.

DexSqTick

Scalable solution for future expansion

The racking system has been designed to integrate with future mezzanine and automation works, supporting a staged development approach.

DexSqTick

Improved operational layout

The warehouse layout supports efficient movement, improved workflow, and clearly defined storage zones.

DSC04721
DSC04360
DSC04303
DSC04419-2

Why Amer Sports Chose Dexion Victoria

DSC04268

Dexion Victoria was engaged based on existing relationships and proven capability delivering large-scale warehouse storage solutions.

This project highlights Dexion Victoria’s ability to deliver value beyond product supply, including:

DexTick

Strong project coordination across multiple stakeholders

DexTick

Ability to deliver staged warehouse installations

DexTick

Engineering-led design approach

DexTick

Experienced installation teams

DexTick

Flexibility to adapt to changing project requirements

DexTick

Delivery aligned with programme expectations

Dexion Victoria continues to support clients across Melbourne and Victoria with warehouse storage solutions designed to improve efficiency, safety and long-term performance.

Need a Warehouse Racking Fit-Out in Melbourne or Victoria?

If your business is planning a new warehouse, expanding capacity, or upgrading an existing facility, 
Dexion Victoria can help.

Whether you need pallet racking in Melbourne, a full warehouse fit-out, or a tailored warehouse storage solution in Victoria, our team works with you to deliver practical, scalable outcomes.

Contact Dexion Victoria to discuss your next project.